|
D Plus 22 (D+22) 13 March 1945 - The Assault of Iwo Jima |
|
|
|
Page 1 of 4 9th Marines The 3d Bn 21st Mar was to act as a holding force as was the division reserve, the 2d Bn 9th Mar. The attack jumped off at 0700 12 Mar. The 1st Bn met strong resistance and its advance was slow. Tanks were brought into the action, but their use was again restricted by poor terrain. An armored bulldozer was used to clear a road for the tanks. At most, two tanks were able to operate in the area. The 3d Bn 9th mar to the north and somewhat easier going as resistance was light, especially on its right (N) flank. The same attack was continued on March 13th and again on 14th March. The 1st Bn relieved the engaged elements of the 3d Bn 21st Mar on the morning of March 13th and the latter reverted to control of its own regiment at 0930 13 March. Definite progress was made by the 1st Bn who, with the use of tanks, succeeding in knocking out many well fortified positions. 21st Marines V. 13 Mar. The Mission of protecting the 5th Division right flank and clearing the beach area in 235 and 236 was assigned to this Regt. The 1st Bn patrolled the beach area encountering small groups of enemy and killing same, protected the 5th Div right flank during the entire day. 3d Bn was released to the Regt and placed in assembly area at 200 G, H.
<< Start < Prev 1 2 3 4 Next > End >> |